This content requires the Adobe Flash Player.  Download Free Flash Player Now. Download Free Flash Player Now
 
1 / 5 


Release of the Final Environmental Impact Statement/Report (FEIS/R)
The Final Environmental Impact Statement/Impact Report (FEIS/R) was circulated in October 2008. The FEIS/R document presents an update of the DEIS/R, identifies the refined Presidio Parkway as the Preferred Alternative and includes design refinements and other revisions as appropriate or in response to comments on the DEIS/R. The FEIS/R also contains avoidance, minimization and mitigation measures as well as the comments received on the DEIS/R and responses to those comments.
world class redesign
 
The existing south access road to the Golden Gate Bridge known as Doyle Drive or Route 101 is going to be completely replaced. The roadway is facing the same problem that threatens other areas of our nation’s infrastructure--the ravages of time and continual use. Originally built in 1936, Doyle Drive is approaching the end of its useful life.

The Doyle Drive replacement project is a world-class redesign of the existing roadway that when constructed will improve the seismic, structural, and traffic safety of Doyle Drive.

read more